- special district
- California · Tulare County
- 2028 cohort · 562 days left
King River East Groundwater Sustainability Agency: ADA Title II document accessibility deadline and status
Our October 13, 2026 crawl of kingsrivereast.org(opens in new tab) found 191 public documents, about 3,559 pages. 7 of the 50 files we checked passed basic machine checks.
Claim the page at no cost to see every document we found and each file's results. Work at King River East Groundwater Sustainability Agency? Claim or correct this page.
- documents found
- 191
- estimated pages
- 3,559
- checked files passed
- 7 / 50
- crawl date
- Oct 13, 2026
What our crawl found on kingsrivereast.org
Counts from our October 13, 2026 crawl, which visited 83 pages. Our crawler found 191 public documents on kingsrivereast.org — an estimated 3,559 pages your team would otherwise inventory by hand.
Documents by category
- Other110 · 58%
- Agendas & minutes65 · 34%
- Reports13 · 7%
- Policies2 · 1%
- Newsletters1 · <1%
No single category dominates this inventory — the largest bucket is uncategorized material at 58% — so a short sampling pass is the fastest way to establish remediation priorities.
By file format
- PDF 191 · 100%
Checked sample
7 of 50 passed(14%)
- Passed basic checks: 7
- Did not pass: 43
Most checked files are missing basics such as tags, a document title, a declared language or labeled form fields. Files made without accessibility tooling usually look like this, and they need structural work, not touch-ups.
The rate covers the 50 files we checked, not all 191 documents. Checks cover tag structure, document language, title, image alt text and form-field labels.
Scanned share
14% scanned
Most of the collection is digital-native text, which keeps remediation at the lighter end: tagging and structure work rather than OCR.
Scanned images need text recognition (OCR) before they can be tagged.
This crawl found no forms.
Crawl scope
- Crawl date
- October 13, 2026
- Pages visited
- 83
- Documents in the inventory
- 191
- Files checked
- 50
- Limits hit
- None reported
- Started from
- kingsrivereast.org(opens in new tab)
These are machine checks on a sample, not a compliance finding, and they say nothing about the people who publish King River East Groundwater Sustainability Agency's documents. The results for the sampled files are public above. The full inventory of every document we found, with detailed per-file reports, is available to verified staff of King River East Groundwater Sustainability Agency after claiming this page.
Files we checked on kingsrivereast.org
Links go to the files on kingsrivereast.org as we found them on October 13, 2026.
These are automated checks on a sample of files as published on October 13, 2026. They are not a legal compliance finding and don't cover reading order, alt-text quality or table structure. Something wrong? Ask for a correction or removal.
| File | Category | Result | Checks not passed |
|---|---|---|---|
| 180124 outreach-mtg-agenda-1PDF · 1 page | Agendas & minutes | Did not pass | Document title |
| 220217 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| KM_C454e-20220516123008220519 kregsa-agenda-package · PDF · 59 pages | Agendas & minutes | Did not pass | Tagged structure, Document language |
| 230323 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 230817 -kregsaminutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 231221 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 240321 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 240620 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 240919 -kregsa-minutesPDF · 3 pages | Agendas & minutes | Did not pass | Document title |
| 241219 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 250121 -spkregsa-minutesPDF · 3 pages | Agendas & minutes | Did not pass | Document title |
| 250320 -kregsa-minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 250717 -minutesPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 260416 -KREGSA-SPAgendaPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| 260521 -kregsa-spagendaPDF · 2 pages | Agendas & minutes | Did not pass | Document title |
| Microsoft Word - 260727_ KREGSA SPAgenda260727 -kregsa-spagenda · PDF · 2 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Image alt text |
| 2018-02-01-resolutionPDF · 4 pages | Policies | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 100878-kings-river-conservation-gsa-newsletter-mailer-low-res-proofPDF · 2 pages | Newsletters | Did not pass | Document title |
| 093019-financial-statementsPDF · 17 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 093022-kregsa-financial-statementsPDF · 20 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 180930 audited-financial-statementsPDF · 17 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 2025-kings-river-east-gsa-financial-statementsPDF · 21 pages | Reports | Did not pass | Document title |
| audit-fs-09.30.2021PDF · 20 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| gw-fee-reportPDF · 22 pages | Reports | Did not pass | Tagged structure, Document title, Image alt text |
| kregsa-093020-financial-statementsPDF · 18 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 2024 Engagement Letterkregsa-093024-financial-statements · PDF · 20 pages | Reports | Did not pass | Tagged structure, Document language, Image alt text |
| Microsoft Word - FS 093023kregsa-2023-financial-statements · PDF · 20 pages | Reports | Did not pass | Tagged structure, Document language, Image alt text |
| kregsa-2026-fee-study roll-finalPDF · 333 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| SGW Strategic Plan v18.inddsgmp · PDF · 32 pages | Reports | Did not pass | Tagged structure, Document language, Image alt text |
| wy-2025-kings-annual-report-articlePDF · 2 pages | Reports | Did not pass | Document title |
| wy-2025-kings-annual-report-article-spanishPDF · 2 pages | Reports | Did not pass | Document title |
| 2019-02-01 memorandumPDF · 2 pages | Other | Did not pass | Document title |
| 20260915 mtg-cancelPDF · 1 page | Other | Did not pass | Document title |
| SKM_C3321i25012014370250121 kregsa spboardpackage · PDF · 31 pages | Other | Did not pass | Tagged structure, Document language |
| SKM_C450i25031909160250320 board-package · PDF · 72 pages | Other | Did not pass | Tagged structure, Document language |
| SKM_C3321i25071709230250717 board-package-1 · PDF · 88 pages | Other | Did not pass | Tagged structure, Document language, Image alt text |
| SKM_C3321i25091610120250918 board-package · PDF · 98 pages | Other | Did not pass | Tagged structure, Document language |
| SKM_C3321i26011408420260115 kregsa-board-package · PDF · 75 pages | Other | Did not pass | Tagged structure, Document language |
| SKM_C450i26031710110260319 kregsa-brd.-mtg.-cancellation · PDF · 1 page | Other | Did not pass | Tagged structure, Document language, Image alt text |
| kregsa-fee-notice-overviewPDF · 6 pages | Other | Did not pass | Document title |
| Microsoft Word - GSP Outline v3kregsa-gsp-outline · PDF · 63 pages | Other | Did not pass | Tagged structure, Document language |
| savethedate sgma-asst-workshopsPDF · 1 page | Other | Did not pass | Document title |
| Untitledsb37 90 · PDF · 10 pages | Other | Did not pass | Form field labels |
| John:20220217 irr-water-board-selection-agenda · PDF · 1 page | Agendas & minutes | Passed | None |
| Well Mitigation Policies and Procedures2024-0422-kings-groundwater-subbasin-well-mitigation-rules-and-regulations11 · PDF · 25 pages | Policies | Passed | None |
| John:190221 public-hearing-notice · PDF · 1 page | Other | Passed | None |
| John:2017-01-prop-26-fee-outreach · PDF · 1 page | Other | Passed | None |
| NOTICE OF INTENTION TO AMEND THE CONFLICT-OF- INTEREST CODE210525 notice-of-intent-to-adopt · PDF · 1 page | Other | Passed | None |
| John:250116 kregsa-brd.-mtg.-cancellation-notice · PDF · 1 page | Other | Passed | None |
| John:250619 cancellation · PDF · 1 page | Other | Passed | None |
Show all 50 filesShow fewer
What each check looks for
- Tagged structure
- The file has a tag tree, so assistive technology can tell headings, lists and paragraphs apart.
- Document language
- The file declares its language, so screen readers pronounce it correctly.
- Document title
- The file has a document title, shown instead of the file name.
- Image alt text
- Every image in a tagged file carries alternative text, or the file has no untagged images.
- Form field labels
- Every fillable form field has a label a screen reader can announce.
How we measured this
1.Crawl
We start at the organization's website and follow its sitemaps and links on the same site. We respect robots.txt and crawl delays, and skip login areas.
2.Classify
Each document is sorted by file format and, from its link text and file name, into a category such as forms or agendas. Page counts are estimated, often without downloading the whole file.
3.Check a sample
We open up to 50 PDFs and run basic machine checks: tags, document title, language, image alt text and form-field labels.
4.Publish only with evidence
Figures appear only when a crawl finds at least 25 documents and checks at least 20 of them.
Limits of this method
- We only see public pages we can reach through links or sitemaps. Documents behind logins or on other services may be missed.
- Crawls stop at page, document and time limits. When one is hit, the counts are minimums.
- Categories and page counts are estimates from links, file names and file metadata.
- Machine checks can't judge reading order, alt text quality or table structure. Passing them is not WCAG 2.1 AA conformance.
- Figures describe the site on the crawl date, not today.
This page's evidence
- Crawled October 13, 2026: we fetched 83 pages from https://kingsrivereast.org/ and found 191 documents.
- The pass rate comes from machine checks on 50 of those documents, not from checking every file.
- Changelog: October 13, 2026 — inventory refreshed from the latest crawl.
- How we crawl, classify and check documents
Plan the work before April 26, 2028
562 days is enough time to work through a backlog in stages, if the inventory starts now.
Where King River East Groundwater Sustainability Agency should start
Start with rate schedules, service applications and water quality reports: the documents customers rely on.
Customers need these files to start service, understand rates and read water quality results.
Usually owned by the general manager, customer service and the board secretary.
A timeline to April 26, 2028
Inventory and triage
by January 4, 2027
Fix the documents people use most
by September 14, 2027
Everything in use conforms
by April 26, 2028
A planning split of the time left, not a legal requirement.
Estimated cost with DocoMatic
$1,210 – $1,815
≈ 6,049 credits for 3,559 estimated pages
- 0 form pages at Level 3 (field labeling and tab order)
- 498 scanned pages (OCR plus Level 2 tagging)
- 3,061 standard pages at Level 1
This is a directional estimate from crawler statistics, not a quote. Run the remediation cost calculator with your own page counts for a tailored figure.
What DocoMatic does
- Finds the PDF, Word, PowerPoint and Excel files on your website and estimates the backlog.
- Fixes documents at three levels, from basic tagging to complex forms.
- Checks every fixed file, with veraPDF PDF/UA-1 validation from Level 2 up.
- Human review: turn it on when you request a fix, or arrange it with our team.
- Monitors your site so new documents don't rebuild the backlog.
Buying for a larger organization? Book a 20-minute demo(opens in new tab)
Is this your organization?
If you work at King River East Groundwater Sustainability Agency, claim this page at no cost with an email address on kingsrivereast.org. You can check the figures, choose which ones are public and see the file-level inventory in the app.
Claiming isn't an admission of anything. It gives your team control of what this page shows.
Claim this pageSomething wrong or out of date?
Tell us what to fix. Our team reviews every request and replies by email.
Request a correction or takedown
If you represent King River East Groundwater Sustainability Agency and something on this page is wrong, tell us. Requests are recorded, reviewed by DocoMatic staff and answered by email. If a takedown request is accepted, this page stops publishing statistics about King River East Groundwater Sustainability Agency.
Compare with similar organizations
King River East Groundwater Sustainability Agency beside the special districts in California closest to it in population that also have published reports.
| Organization | Population | Documents found | Estimated pages | Crawled |
|---|---|---|---|---|
| King River East Groundwater Sustainability Agency (this page) | — | 191 | 3,559 | October 13, 2026 |
| Alameda Corridor Transportation Authority | — | 1,492 | 20,624 | October 7, 2026 |
| Alameda County Housing Authority | — | 447 | 12,685 | October 7, 2026 |
| Alameda County Mosquito Abatement District | — | 269+ | 7,488 | October 7, 2026 |
| Alameda County Resource Conservation District | — | 95 | 1,324 | October 7, 2026 |
| Alameda County Transportation Commission | — | 2,825 | 52,918 | October 7, 2026 |
Each figure comes from that organization’s own crawl; a + marks a crawl that stopped at a limit, so its count is a minimum. The table compares document inventories, not accessibility.
Related organizations
Special districts in California
- Alameda Corridor Transportation Authority: ADA deadline report
1,492 documents · due April 26, 2028
- Alameda County Housing Authority: ADA deadline report
447 documents · due April 26, 2028
- Alameda County Mosquito Abatement District: ADA deadline report
269 documents · due April 26, 2028
- Alameda County Resource Conservation District: ADA deadline report
95 documents · due April 26, 2028
Also due April 26, 2028 in California
- Ravendale-Termo Elementary School District: ADA deadline report
school district · 89 documents · due April 26, 2028
- Green Point Elementary School District: ADA deadline report
school district · 42 documents · due April 26, 2028
- Silver Fork Elementary School District: ADA deadline report
school district · 75 documents · due April 26, 2028
- City of Industry: ADA deadline report
city · 335 documents · due April 26, 2028
Frequently asked questions
When is King River East Groundwater Sustainability Agency's ADA Title II deadline?
April 26, 2028. King River East Groundwater Sustainability Agency is in the 2028 cohort under the Department of Justice's rule on web and mobile accessibility for state and local governments, with compliance dates as set by the Department's interim final rule of April 20, 2026 (91 FR 20902).
How was King River East Groundwater Sustainability Agency's deadline set?
King River East Groundwater Sustainability Agency is a special district government, and the Census Bureau calculates no population for one. The rule gives every special district government the later date, whatever the size of the area it serves.
How many public documents does King River East Groundwater Sustainability Agency have?
Our crawl on October 13, 2026 fetched 83 pages from https://kingsrivereast.org/ and found 191 documents, an estimated 3,559 pages. The full file-level list is available to verified staff after claiming the page.
How many of King River East Groundwater Sustainability Agency's documents pass accessibility checks?
7 of the 50 files we checked passed basic machine checks (14%). That is a sample of the 191 documents we found, and passing basic checks is not full WCAG 2.1 AA conformance.
How much would it cost to fix King River East Groundwater Sustainability Agency's documents?
Our directional estimate is $1,210 to $1,815 with DocoMatic: about 6,049 credits for 3,559 estimated pages, based on this crawl. It is not a quote.
Which documents should King River East Groundwater Sustainability Agency fix first?
Start with rate schedules, service applications and water quality reports: the documents customers rely on.
Do older PDFs have to be made accessible too?
Not all of them. Documents already posted before the compliance date are excepted unless they are currently used to apply for, gain access to, or participate in the organization's services, programs or activities (28 CFR 35.201(b)). Genuinely archived content is excepted too, but only while it is kept solely for reference, research or recordkeeping, sits in a clearly identified archive area and is not changed. Everything published from the compliance date on is covered, and so is any older file people still use to reach a service.