DocoMatic
  • special district
  • California · San Diego County
  • 2028 cohort · 562 days left

San Diego Metropolitan Transit System: ADA Title II document accessibility deadline and status

Our October 16, 2026 crawl of sdmts.com(opens in new tab) found at least 362 public documents, about 2,042 pages. 3 of the 50 files we checked passed basic machine checks.

Claim the page at no cost to see every document we found and each file's results. Work at San Diego Metropolitan Transit System? Claim or correct this page.

documents found
362+
estimated pages
2,042
checked files passed
3 / 50
crawl date
Oct 16, 2026

What our crawl found on sdmts.com

Counts from our October 16, 2026 crawl, which visited 135 pages. Our crawler found 362 public documents on sdmts.com — an estimated 2,042 pages your team would otherwise inventory by hand.

The crawl stopped at its time limit, so every count here is a minimum: the site has at least this many documents.

Documents by category

  • Other116 · 32%
  • Policies80 · 22%
  • Agendas & minutes77 · 21%
  • Reports47 · 13%
  • Forms42 · 12%

No single category dominates this inventory — the largest bucket is uncategorized material at 32% — so a short sampling pass is the fastest way to establish remediation priorities.

By file format

  • PDF 359 · 99%
  • Excel (XLSX) 2 · <1%
  • Word (DOCX) 1 · <1%

Checked sample

3 of 50 passed(6%)

  • Passed basic checks: 3
  • Did not pass: 47

Most checked files are missing basics such as tags, a document title, a declared language or labeled form fields. Files made without accessibility tooling usually look like this, and they need structural work, not touch-ups.

The rate covers the 50 files we checked, not all 362 documents. Checks cover tag structure, document language, title, image alt text and form-field labels.

Scanned share

8% scanned

Most of the collection is digital-native text, which keeps remediation at the lighter end: tagging and structure work rather than OCR.

Scanned images need text recognition (OCR) before they can be tagged.

Forms make up 12% of the documents. Forms take the most work to fix, since every field needs a label and a logical tab order.

Crawl scope

Crawl date
October 16, 2026
Pages visited
135
Documents in the inventory
362
Files checked
50
Limits hit
time

These are machine checks on a sample, not a compliance finding, and they say nothing about the people who publish San Diego Metropolitan Transit System's documents. The results for the sampled files are public above. The full inventory of every document we found, with detailed per-file reports, is available to verified staff of San Diego Metropolitan Transit System after claiming this page.

Files we checked on sdmts.com

Links go to the files on sdmts.com as we found them on October 16, 2026.

These are automated checks on a sample of files as published on October 16, 2026. They are not a legal compliance finding and don't cover reading order, alt-text quality or table structure. Something wrong? Ask for a correction or removal.

Show
The 50 files checked in the sample, with each file's result
FileCategoryResultChecks not passed
2026-02-27-tac-minutes-adaPDF · 6 pagesAgendas & minutesDid not passTagged structure, Document title
2026-05-13-tac-pre-meeting-packetPDF · 123 pagesAgendas & minutesDid not passTagged structure, Document title, Image alt text, Form field labels
2026-06-18-asac-minutes---adaPDF · 7 pagesAgendas & minutesDid not passDocument title
2026-09-03---ec-minutes---adaPDF · 6 pagesAgendas & minutesDid not passDocument title
2026-09-17-asac-pre-meeting-packet 0PDF · 93 pagesAgendas & minutesDid not passTagged structure, Document title, Image alt text, Form field labels
2026-10-01---ec-pre-meeting-packet 1PDF · 151 pagesAgendas & minutesDid not passTagged structure, Document title, Image alt text, Form field labels
2026-10-09---psc-agendaPDF · 1 pageAgendas & minutesDid not passDocument title
2026-10-13-sdae-agendaPDF · 1 pageAgendas & minutesDid not passDocument title
2026-10-15---board-agendaPDF · 4 pagesAgendas & minutesDid not passDocument title
form 802PDF · 3 pagesFormsDid not passDocument language, Document title, Form field labels
CA Form 802form-802-2024-ga-pride-final · PDF · 2 pagesFormsDid not passForm field labels
form-802-2024-pac-artsPDF · 3 pagesFormsDid not passTagged structure, Document language, Document title
CA Form 802form-802-2024-sd-county-fair-final · PDF · 2 pagesFormsDid not passTagged structure, Document language
form-802-2024-shamrock-finalPDF · 2 pagesFormsDid not passTagged structure, Document language, Document title
CA Form 802form-802-2024-vip-pride-final · PDF · 1 pageFormsDid not passForm field labels
CA Form 802form-802-2025-sd-fc-3.1.25-final · PDF · 1 pageFormsDid not passForm field labels
CA Form 802form-802-trolley-dances · PDF · 1 pageFormsDid not passTagged structure, Document language
Form801PDF · 2 pagesFormsDid not passTagged structure, Document language, Document title, Form field labels
mts-resolutions-listPDF · 61 pagesPoliciesDid not passDocument title
Microsoft Word - REVISED ORD. 1 MAY 2005Ordinance No. 1 · PDF · 8 pagesPoliciesDid not passTagged structure, Document language
Microsoft Word - Ordinance No. 10.docOrdinance No. 10 · PDF · 2 pagesPoliciesDid not passTagged structure, Document language
ordinance no. 3PDF · 4 pagesPoliciesDid not passTagged structure, Document language, Document title
ordinance no. 4 0PDF · 13 pagesPoliciesDid not passTagged structure, Document title
Microsoft Word - Ordinance No. 6.docOrdinance No. 6 · PDF · 1 pagePoliciesDid not passTagged structure, Document language
Ordinance No. 7PDF · 4 pagesPoliciesDid not passTagged structure, Document language, Document title
Ordinance No. 8PDF · 4 pagesPoliciesDid not passTagged structure, Document language, Document title
ordinance-no.14PDF · 3 pagesPoliciesDid not passTagged structure, Document title
video-system-procedures-9162026PDF · 13 pagesPoliciesDid not passDocument title
budget book fy21PDF · 144 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
commreport-web1PDF · 10 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
fy-2027-budget-book-finalPDF · 146 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
fy2022 budgetPDF · 146 pagesReportsDid not passTagged structure, Document title, Image alt text
fy2023-budget-bookPDF · 142 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
fy2025-budget-bookPDF · 154 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
fy2026-budget-book-finalPDF · 147 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
fy24-budget-book-finalPDF · 144 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
mts-harassment-survey-findings-reportPDF · 93 pagesReportsDid not passDocument title
010311 Lego BraunPDF · 1 pageOtherDid not passTagged structure, Document language, Document title, Image alt text
081310 COMEDYPDF · 1 pageOtherDid not passTagged structure, Document language, Document title, Image alt text
111909 AMTRAKPDF · 1 pageOtherDid not passTagged structure, Document language, Document title, Image alt text
CA Form 801.pdfbrendan-shannon-prism-march-801 · PDF · 2 pagesOtherDid not passTagged structure, Document language, Image alt text
daniel-brislin-narcan-donation-801PDF · 2 pagesOtherDid not passTagged structure, Document language, Document title
form 801 - csac - eiaPDF · 1 pageOtherDid not passTagged structure, Document language, Document title
Form801-HawaiiChamber-June2014 000PDF · 1 pageOtherDid not passTagged structure, Document language, Document title
Form801-ShanghaiApril2014 000PDF · 1 pageOtherDid not passTagged structure, Document language, Document title
Form801-TOPS-June2014 000PDF · 1 pageOtherDid not passTagged structure, Document language, Document title
rtm nov2021PDF · 2 pagesOtherDid not passTagged structure, Document title, Image alt text
C32026-05-28-sdrba-agenda 1 · PDF · 2 pagesAgendas & minutesPassedNone
CA Form 802form-802-bella-vista-fest · PDF · 1 pageFormsPassedNone
THE san diego metropolitan transit system a study of its economic impactmts impact study final · PDF · 35 pagesReportsPassedNone
Show all 50 files

What each check looks for

Tagged structure
The file has a tag tree, so assistive technology can tell headings, lists and paragraphs apart.
Document language
The file declares its language, so screen readers pronounce it correctly.
Document title
The file has a document title, shown instead of the file name.
Image alt text
Every image in a tagged file carries alternative text, or the file has no untagged images.
Form field labels
Every fillable form field has a label a screen reader can announce.

How we measured this

  1. 1.Crawl

    We start at the organization's website and follow its sitemaps and links on the same site. We respect robots.txt and crawl delays, and skip login areas.

  2. 2.Classify

    Each document is sorted by file format and, from its link text and file name, into a category such as forms or agendas. Page counts are estimated, often without downloading the whole file.

  3. 3.Check a sample

    We open up to 50 PDFs and run basic machine checks: tags, document title, language, image alt text and form-field labels.

  4. 4.Publish only with evidence

    Figures appear only when a crawl finds at least 25 documents and checks at least 20 of them.

Limits of this method

  • We only see public pages we can reach through links or sitemaps. Documents behind logins or on other services may be missed.
  • Crawls stop at page, document and time limits. When one is hit, the counts are minimums.
  • Categories and page counts are estimates from links, file names and file metadata.
  • Machine checks can't judge reading order, alt text quality or table structure. Passing them is not WCAG 2.1 AA conformance.
  • Figures describe the site on the crawl date, not today.

This page's evidence

  • Crawled October 16, 2026: we fetched 135 pages from https://www.sdmts.com/ and found 362 documents.
  • The pass rate comes from machine checks on 50 of those documents, not from checking every file.
  • Changelog: October 16, 2026 — inventory refreshed from the latest crawl.
  • How we crawl, classify and check documents

Plan the work before April 26, 2028

562 days is enough time to work through a backlog in stages, if the inventory starts now.

Where San Diego Metropolitan Transit System should start

Start with schedules, route maps and paratransit or reduced-fare applications: riders rely on them daily.

Riders need these files to plan trips and apply for reduced fares or paratransit.

Usually owned by customer service, planning and the board secretary.

A timeline to April 26, 2028

  1. Inventory and triage

    by January 4, 2027

  2. Fix the documents people use most

    by September 14, 2027

  3. Everything in use conforms

    by April 26, 2028

A planning split of the time left, not a legal requirement.

Estimated cost with DocoMatic

$1,927 – $2,891

≈ 9,635 credits for 2,042 estimated pages

  • 237 form pages at Level 3 (field labeling and tab order)
  • 144 scanned pages (OCR plus Level 2 tagging)
  • 1,661 standard pages at Level 1

This is a directional estimate from crawler statistics, not a quote. Run the remediation cost calculator with your own page counts for a tailored figure.

What DocoMatic does

  • Finds the PDF, Word, PowerPoint and Excel files on your website and estimates the backlog.
  • Fixes documents at three levels, from basic tagging to complex forms.
  • Checks every fixed file, with veraPDF PDF/UA-1 validation from Level 2 up.
  • Human review: turn it on when you request a fix, or arrange it with our team.
  • Monitors your site so new documents don't rebuild the backlog.

Is this your organization?

If you work at San Diego Metropolitan Transit System, claim this page at no cost with an email address on sdmts.com. You can check the figures, choose which ones are public and see the file-level inventory in the app.

Claiming isn't an admission of anything. It gives your team control of what this page shows.

Claim this page

Something wrong or out of date?

Tell us what to fix. Our team reviews every request and replies by email.

Request a correction or takedown

If you represent San Diego Metropolitan Transit System and something on this page is wrong, tell us. Requests are recorded, reviewed by DocoMatic staff and answered by email. If a takedown request is accepted, this page stops publishing statistics about San Diego Metropolitan Transit System.

What are you asking for?

At least 20 characters. Name the figures you dispute if you can.

Compare with similar organizations

San Diego Metropolitan Transit System beside the special districts in California closest to it in population that also have published reports.

OrganizationPopulationDocuments foundEstimated pagesCrawled
San Diego Metropolitan Transit System (this page)—362+2,042October 16, 2026
Alameda Corridor Transportation Authority—1,49220,624October 7, 2026
Alameda County Housing Authority—44712,685October 7, 2026
Alameda County Mosquito Abatement District—269+7,488October 7, 2026
Alameda County Resource Conservation District—951,324October 7, 2026
Alameda County Transportation Commission—2,82552,918October 7, 2026

Each figure comes from that organization’s own crawl; a + marks a crawl that stopped at a limit, so its count is a minimum. The table compares document inventories, not accessibility.

Related organizations

Special districts in California

Also due April 26, 2028 in California

Frequently asked questions

When is San Diego Metropolitan Transit System's ADA Title II deadline?

April 26, 2028. San Diego Metropolitan Transit System is in the 2028 cohort under the Department of Justice's rule on web and mobile accessibility for state and local governments, with compliance dates as set by the Department's interim final rule of April 20, 2026 (91 FR 20902).

How was San Diego Metropolitan Transit System's deadline set?

San Diego Metropolitan Transit System is a special district government, and the Census Bureau calculates no population for one. The rule gives every special district government the later date, whatever the size of the area it serves.

How many public documents does San Diego Metropolitan Transit System have?

Our crawl on October 16, 2026 fetched 135 pages from https://www.sdmts.com/ and found at least 362 documents (it stopped at a crawl limit), an estimated 2,042 pages. The full file-level list is available to verified staff after claiming the page.

How many of San Diego Metropolitan Transit System's documents pass accessibility checks?

3 of the 50 files we checked passed basic machine checks (6%). That is a sample of the 362 documents we found, and passing basic checks is not full WCAG 2.1 AA conformance.

How much would it cost to fix San Diego Metropolitan Transit System's documents?

Our directional estimate is $1,927 to $2,891 with DocoMatic: about 9,635 credits for 2,042 estimated pages, based on this crawl. It is not a quote.

Which documents should San Diego Metropolitan Transit System fix first?

Start with schedules, route maps and paratransit or reduced-fare applications: riders rely on them daily.

Do older PDFs have to be made accessible too?

Not all of them. Documents already posted before the compliance date are excepted unless they are currently used to apply for, gain access to, or participate in the organization's services, programs or activities (28 CFR 35.201(b)). Genuinely archived content is excepted too, but only while it is kept solely for reference, research or recordkeeping, sits in a clearly identified archive area and is not changed. Everything published from the compliance date on is covered, and so is any older file people still use to reach a service.