- special district
- California · San Diego County
- 2028 cohort · 562 days left
San Elijo Joint Powers Authority: ADA Title II document accessibility deadline and status
Our October 16, 2026 crawl of sejpa.org(opens in new tab) found at least 490 public documents, about 12,917 pages. 7 of the 50 files we checked passed basic machine checks.
Claim the page at no cost to see every document we found and each file's results. Work at San Elijo Joint Powers Authority? Claim or correct this page.
- documents found
- 490+
- estimated pages
- 12,917
- checked files passed
- 7 / 50
- crawl date
- Oct 16, 2026
What our crawl found on sejpa.org
Counts from our October 16, 2026 crawl, which visited 38 pages. Our crawler found 490 public documents on sejpa.org — an estimated 12,917 pages your team would otherwise inventory by hand.
The crawl stopped at its time limit, so every count here is a minimum: the site has at least this many documents.
Documents by category
- Agendas & minutes392 · 80%
- Reports52 · 11%
- Other42 · 9%
- Policies2 · <1%
- Forms1 · <1%
- Newsletters1 · <1%
Meeting agendas and minutes dominate this inventory at 80% of all documents. Packets published from the compliance date on have to be accessible, as do older ones residents still use to take part in a meeting or a process; older packets kept only for reference may fall under the rule's exceptions.
By file format
- PDF 490 · 100%
Checked sample
7 of 50 passed(14%)
- Passed basic checks: 7
- Did not pass: 43
Most checked files are missing basics such as tags, a document title, a declared language or labeled form fields. Files made without accessibility tooling usually look like this, and they need structural work, not touch-ups.
The rate covers the 50 files we checked, not all 490 documents. Checks cover tag structure, document language, title, image alt text and form-field labels.
Scanned share
8% scanned
Most of the collection is digital-native text, which keeps remediation at the lighter end: tagging and structure work rather than OCR.
Scanned images need text recognition (OCR) before they can be tagged.
Forms are a small part of this inventory (0%), but each one needs labeled fields and a working tab order before someone using a screen reader can fill it in.
Crawl scope
- Crawl date
- October 16, 2026
- Pages visited
- 38
- Documents in the inventory
- 490
- Files checked
- 50
- Limits hit
- time
- Started from
- sejpa.org(opens in new tab)
These are machine checks on a sample, not a compliance finding, and they say nothing about the people who publish San Elijo Joint Powers Authority's documents. The results for the sampled files are public above. The full inventory of every document we found, with detailed per-file reports, is available to verified staff of San Elijo Joint Powers Authority after claiming this page.
Files we checked on sejpa.org
Links go to the files on sejpa.org as we found them on October 16, 2026.
These are automated checks on a sample of files as published on October 16, 2026. They are not a legal compliance finding and don't cover reading order, alt-text quality or table structure. Something wrong? Ask for a correction or removal.
| File | Category | Result | Checks not passed |
|---|---|---|---|
| 2026 March 17 Complete AgendaPDF · 33 pages | Agendas & minutes | Did not pass | Document language, Document title |
| 2026 May 19 Complete Agenda - RevisedPDF · 130 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 2026 October 20 AgendaPDF · 128 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 2026 September 15 Complete AgendaPDF · 179 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| April 21 MinutesPDF · 6 pages | Agendas & minutes | Did not pass | Document title |
| Complete Agenda - 2026 April 21 - RevisedPDF · 151 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Complete Agenda 2026 February 17 AgendaPDF · 38 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Complete Agenda 2026 January 20 AgendaPDF · 161 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Complete Agenda 2026 June 16 RevisedPDF · 150 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Complete Agenda July 21 2026PDF · 76 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| February 17 MinutesPDF · 5 pages | Agendas & minutes | Did not pass | Document title |
| Microsoft Word - No. 07 January 20 MinutesJan 20 2026 Minutes · PDF · 6 pages | Agendas & minutes | Did not pass | Tagged structure, Document language |
| July 21 2026 MinutesPDF · 4 pages | Agendas & minutes | Did not pass | Document title |
| March 17 MinutesPDF · 4 pages | Agendas & minutes | Did not pass | Document title |
| Minutes for June 16 2026PDF · 7 pages | Agendas & minutes | Did not pass | Document title |
| Job Application - Fill-in 2026 RevisedbPDF · 2 pages | Forms | Did not pass | Document title, Form field labels |
| No. 16 Adopt Budget Investment Policy Appoint Treasurer v2.1PDF · 5 pages | Policies | Did not pass | Document title |
| Resolution 2026-03 - Salary and Benefits Resolution FY27-FY30PDF · 12 pages | Policies | Did not pass | Tagged structure, Document language, Document title |
| Adopted Annual Budget 2022-23PDF · 65 pages | Reports | Did not pass | Tagged structure, Document title, Image alt text |
| Adopted SEJPA - Annual Budget 2020-21 vFinalPDF · 65 pages | Reports | Did not pass | Document title |
| untitledBudget-Adopted-FY 2012-13(1) · PDF · 73 pages | Reports | Did not pass | Tagged structure, Document language, Image alt text |
| Budget-Adopted-FY 2013-14PDF · 73 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| FY 2018-19 Annual BudgetPDF · 74 pages | Reports | Did not pass | Document title |
| FY 2024-25 Budget Book AdoptedPDF · 66 pages | Reports | Did not pass | Tagged structure, Document title, Image alt text |
| Microsoft Word - FY 2025-26 Adopted Budget BookFY 2025-26 Adopted Budget Book1 · PDF · 64 pages | Reports | Did not pass | Tagged structure, Document language |
| Microsoft Word - FY 2026-27 Approved Budget BookFY 2026-27 Approved Budget Book11 · PDF · 64 pages | Reports | Did not pass | Tagged structure, Document language |
| Master FY 2023-24 Adopted Budget Book vFinalPDF · 67 pages | Reports | Did not pass | Document title |
| SEJPA - ADOPTED Annual Budget 2014-2015 v1 0PDF · 61 pages | Reports | Did not pass | Document title |
| Microsoft Word - SEJPA - Adopted Annual Budget 2015-2016SEJPA - Adopted Annual Budget 2015-2016 · PDF · 66 pages | Reports | Did not pass | Tagged structure, Document language, Image alt text |
| Microsoft Word - SEJPA - Recommended Annual Budget 2016-17 v 3 11 ApprovedSEJPA - Adopted Annual Budget 2016-17(4) · PDF · 67 pages | Reports | Did not pass | Tagged structure, Document language, Image alt text |
| SEJPA - Adopted Annual Budget 2017-18 Final(1)PDF · 66 pages | Reports | Did not pass | Tagged structure, Document title, Image alt text |
| SEJPA - Adopted Annual Budget 2019-20 FinalPDF · 68 pages | Reports | Did not pass | Tagged structure, Document title, Image alt text |
| SEJPA - Annual Budget 2021-22 Adopted finalPDF · 64 pages | Reports | Did not pass | Document title |
| 06 Safety Orientation Acknowledgement FormPDF · 1 page | Other | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| ARCH E Recycled Water Distribution System compressed 1PDF · 1 page | Other | Did not pass | Tagged structure, Document language, Document title |
| Christopher TreesPDF · 1 page | Other | Did not pass | Document title |
| Kevin LangPDF · 1 page | Other | Did not pass | Tagged structure, Document language, Document title |
| Michael ThorntonPDF · 1 page | Other | Did not pass | Document title |
| SEJPA Senior Accountant Flyer 2026PDF · 1 page | Other | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Wastewater Service MapSEJPA ServiceArea CollSys 2015 WithCityLabelsresize · PDF · 1 page | Other | Did not pass | Tagged structure, Document language |
| SEJPA Wastewater Treatment Operator Intern cs 1PDF · 2 pages | Other | Did not pass | Document title |
| Senior Accountant Job Description Feb 2026PDF · 4 pages | Other | Did not pass | Document title |
| Tom FalkPDF · 1 page | Other | Did not pass | Document title |
| SEJPA Board Meeting DatesAdopted 2026 Board Meeting Schedule · PDF · 1 page | Agendas & minutes | Passed | None |
| SEJPA Job Bulletins 2024+SEJPA Job Bulletins 2024 1 · PDF · 5 pages | Newsletters | Passed | None |
| NOTICENotice of Next Meeting 2019-10-14 · PDF · 1 page | Other | Passed | None |
| NOTICENotice of Next Meeting 2019-11-12 · PDF · 1 page | Other | Passed | None |
| NOTICENotice of Next Meeting 2023-03-09 · PDF · 1 page | Other | Passed | None |
| NOTICENotice of Next Meeting 2023-11-02 · PDF · 1 page | Other | Passed | None |
| San Elijo Water Reclamation FacilitySan Elijo WateReuse Poster 2012 revised 2018-12 · PDF · 1 page | Other | Passed | None |
Show all 50 filesShow fewer
What each check looks for
- Tagged structure
- The file has a tag tree, so assistive technology can tell headings, lists and paragraphs apart.
- Document language
- The file declares its language, so screen readers pronounce it correctly.
- Document title
- The file has a document title, shown instead of the file name.
- Image alt text
- Every image in a tagged file carries alternative text, or the file has no untagged images.
- Form field labels
- Every fillable form field has a label a screen reader can announce.
How we measured this
1.Crawl
We start at the organization's website and follow its sitemaps and links on the same site. We respect robots.txt and crawl delays, and skip login areas.
2.Classify
Each document is sorted by file format and, from its link text and file name, into a category such as forms or agendas. Page counts are estimated, often without downloading the whole file.
3.Check a sample
We open up to 50 PDFs and run basic machine checks: tags, document title, language, image alt text and form-field labels.
4.Publish only with evidence
Figures appear only when a crawl finds at least 25 documents and checks at least 20 of them.
Limits of this method
- We only see public pages we can reach through links or sitemaps. Documents behind logins or on other services may be missed.
- Crawls stop at page, document and time limits. When one is hit, the counts are minimums.
- Categories and page counts are estimates from links, file names and file metadata.
- Machine checks can't judge reading order, alt text quality or table structure. Passing them is not WCAG 2.1 AA conformance.
- Figures describe the site on the crawl date, not today.
This page's evidence
- Crawled October 16, 2026: we fetched 38 pages from https://www.sejpa.org/ and found 490 documents.
- The pass rate comes from machine checks on 50 of those documents, not from checking every file.
- Changelog: October 16, 2026 — inventory refreshed from the latest crawl.
- How we crawl, classify and check documents
Plan the work before April 26, 2028
562 days is enough time to work through a backlog in stages, if the inventory starts now.
Where San Elijo Joint Powers Authority should start
Start with rate schedules, service applications and board packets: the documents your customers and board rely on.
Customers and residents need these files to use the district's services and follow its board.
Usually owned by the general manager or director and the board secretary.
A timeline to April 26, 2028
Inventory and triage
by January 4, 2027
Fix the documents people use most
by September 14, 2027
Everything in use conforms
by April 26, 2028
A planning split of the time left, not a legal requirement.
Estimated cost with DocoMatic
$3,765 – $5,648
≈ 18,826 credits for 12,917 estimated pages
- 26 form pages at Level 3 (field labeling and tab order)
- 1,031 scanned pages (OCR plus Level 2 tagging)
- 11,860 standard pages at Level 1
This is a directional estimate from crawler statistics, not a quote. Run the remediation cost calculator with your own page counts for a tailored figure.
What DocoMatic does
- Finds the PDF, Word, PowerPoint and Excel files on your website and estimates the backlog.
- Fixes documents at three levels, from basic tagging to complex forms.
- Checks every fixed file, with veraPDF PDF/UA-1 validation from Level 2 up.
- Human review: turn it on when you request a fix, or arrange it with our team.
- Monitors your site so new documents don't rebuild the backlog.
Buying for a larger organization? Book a 20-minute demo(opens in new tab)
Is this your organization?
If you work at San Elijo Joint Powers Authority, claim this page at no cost with an email address on sejpa.org. You can check the figures, choose which ones are public and see the file-level inventory in the app.
Claiming isn't an admission of anything. It gives your team control of what this page shows.
Claim this pageSomething wrong or out of date?
Tell us what to fix. Our team reviews every request and replies by email.
Request a correction or takedown
If you represent San Elijo Joint Powers Authority and something on this page is wrong, tell us. Requests are recorded, reviewed by DocoMatic staff and answered by email. If a takedown request is accepted, this page stops publishing statistics about San Elijo Joint Powers Authority.
Compare with similar organizations
San Elijo Joint Powers Authority beside the special districts in California closest to it in population that also have published reports.
| Organization | Population | Documents found | Estimated pages | Crawled |
|---|---|---|---|---|
| San Elijo Joint Powers Authority (this page) | — | 490+ | 12,917 | October 16, 2026 |
| Alameda Corridor Transportation Authority | — | 1,492 | 20,624 | October 7, 2026 |
| Alameda County Housing Authority | — | 447 | 12,685 | October 7, 2026 |
| Alameda County Mosquito Abatement District | — | 269+ | 7,488 | October 7, 2026 |
| Alameda County Resource Conservation District | — | 95 | 1,324 | October 7, 2026 |
| Alameda County Transportation Commission | — | 2,825 | 52,918 | October 7, 2026 |
Each figure comes from that organization’s own crawl; a + marks a crawl that stopped at a limit, so its count is a minimum. The table compares document inventories, not accessibility.
Related organizations
Special districts in California
- Alameda Corridor Transportation Authority: ADA deadline report
1,492 documents · due April 26, 2028
- Alameda County Housing Authority: ADA deadline report
447 documents · due April 26, 2028
- Alameda County Mosquito Abatement District: ADA deadline report
269 documents · due April 26, 2028
- Alameda County Resource Conservation District: ADA deadline report
95 documents · due April 26, 2028
Also due April 26, 2028 in California
- Ravendale-Termo Elementary School District: ADA deadline report
school district · 89 documents · due April 26, 2028
- Green Point Elementary School District: ADA deadline report
school district · 42 documents · due April 26, 2028
- Silver Fork Elementary School District: ADA deadline report
school district · 75 documents · due April 26, 2028
- City of Industry: ADA deadline report
city · 335 documents · due April 26, 2028
Frequently asked questions
When is San Elijo Joint Powers Authority's ADA Title II deadline?
April 26, 2028. San Elijo Joint Powers Authority is in the 2028 cohort under the Department of Justice's rule on web and mobile accessibility for state and local governments, with compliance dates as set by the Department's interim final rule of April 20, 2026 (91 FR 20902).
How was San Elijo Joint Powers Authority's deadline set?
San Elijo Joint Powers Authority is a special district government, and the Census Bureau calculates no population for one. The rule gives every special district government the later date, whatever the size of the area it serves.
How many public documents does San Elijo Joint Powers Authority have?
Our crawl on October 16, 2026 fetched 38 pages from https://www.sejpa.org/ and found at least 490 documents (it stopped at a crawl limit), an estimated 12,917 pages. The full file-level list is available to verified staff after claiming the page.
How many of San Elijo Joint Powers Authority's documents pass accessibility checks?
7 of the 50 files we checked passed basic machine checks (14%). That is a sample of the 490 documents we found, and passing basic checks is not full WCAG 2.1 AA conformance.
How much would it cost to fix San Elijo Joint Powers Authority's documents?
Our directional estimate is $3,765 to $5,648 with DocoMatic: about 18,826 credits for 12,917 estimated pages, based on this crawl. It is not a quote.
Which documents should San Elijo Joint Powers Authority fix first?
Start with rate schedules, service applications and board packets: the documents your customers and board rely on.
Do older PDFs have to be made accessible too?
Not all of them. Documents already posted before the compliance date are excepted unless they are currently used to apply for, gain access to, or participate in the organization's services, programs or activities (28 CFR 35.201(b)). Genuinely archived content is excepted too, but only while it is kept solely for reference, research or recordkeeping, sits in a clearly identified archive area and is not changed. Everything published from the compliance date on is covered, and so is any older file people still use to reach a service.