DocoMatic
  • special district
  • California · Shasta County
  • 2028 cohort · 562 days left

Anderson Cottonwood Irrigation District: ADA Title II document accessibility deadline and status

Our October 11, 2026 crawl of andersoncottonwoodirrigationdistrict.org(opens in new tab) found 217 public documents, about 9,365 pages. 22 of the 50 files we checked passed basic machine checks.

Claim the page at no cost to see every document we found and each file's results. Work at Anderson Cottonwood Irrigation District? Claim or correct this page.

documents found
217
estimated pages
9,365
checked files passed
22 / 50
crawl date
Oct 11, 2026

What our crawl found on andersoncottonwoodirrigationdistrict.org

Counts from our October 11, 2026 crawl, which visited 4 pages. Our crawler found 217 public documents on andersoncottonwoodirrigationdistrict.org — an estimated 9,365 pages your team would otherwise inventory by hand.

Documents by category

  • Agendas & minutes130 · 60%
  • Other67 · 31%
  • Reports9 · 4%
  • Policies7 · 3%
  • Forms4 · 2%

Meeting agendas and minutes dominate this inventory at 60% of all documents. Packets published from the compliance date on have to be accessible, as do older ones residents still use to take part in a meeting or a process; older packets kept only for reference may fall under the rule's exceptions.

By file format

  • PDF 193 · 89%
  • Word (DOCX) 24 · 11%

Checked sample

22 of 50 passed(44%)

  • Passed basic checks: 22
  • Did not pass: 28

The checked files are mixed: some pass the basics and some don't. Fixing the templates you publish from now, while working through older files in batches, usually saves the most time.

The rate covers the 50 files we checked, not all 217 documents. Checks cover tag structure, document language, title, image alt text and form-field labels.

Scanned share

8% scanned

Most of the collection is digital-native text, which keeps remediation at the lighter end: tagging and structure work rather than OCR.

Scanned images need text recognition (OCR) before they can be tagged.

Forms are a small part of this inventory (2%), but each one needs labeled fields and a working tab order before someone using a screen reader can fill it in.

Crawl scope

Crawl date
October 11, 2026
Pages visited
4
Documents in the inventory
217
Files checked
50
Limits hit
None reported

These are machine checks on a sample, not a compliance finding, and they say nothing about the people who publish Anderson Cottonwood Irrigation District's documents. The results for the sampled files are public above. The full inventory of every document we found, with detailed per-file reports, is available to verified staff of Anderson Cottonwood Irrigation District after claiming this page.

Files we checked on andersoncottonwoodirrigationdistrict.org

Links go to the files on andersoncottonwoodirrigationdistrict.org as we found them on October 11, 2026.

These are automated checks on a sample of files as published on October 11, 2026. They are not a legal compliance finding and don't cover reading order, alt-text quality or table structure. Something wrong? Ask for a correction or removal.

Show
The 50 files checked in the sample, with each file's result
FileCategoryResultChecks not passed
07 24-23-Special-Board-PacketPDF · 16 pagesAgendas & minutesDid not passTagged structure, Document language, Document title
12 14 23-Board-PacketPDF · 74 pagesAgendas & minutesDid not passTagged structure, Document language, Document title
Board-Packet-5.14.26-FinalPDF · 33 pagesAgendas & minutesDid not passTagged structure, Document language, Document title, Image alt text
February-2026-Signed-Approved-Board-MinutesPDF · 5 pagesAgendas & minutesDid not passTagged structure, Document language, Document title
2025 Water-ApplicationPDF · 2 pagesFormsDid not passDocument title
2026 Water-Application-FinalPDF · 2 pagesFormsDid not passDocument title
drainage permitPDF · 1 pageFormsDid not passDocument title
clothing policyPDF · 1 pagePoliciesDid not passDocument title
drug alcohol policy - dept. of transportationPDF · 19 pagesPoliciesDid not passDocument language, Document title, Image alt text
nepotism policyPDF · 1 pagePoliciesDid not passDocument title
rules regulations 2012PDF · 11 pagesPoliciesDid not passDocument language, Document title, Image alt text
vehicle and equipment use policyPDF · 1 pagePoliciesDid not passDocument title
2022 approved budgetPDF · 4 pagesReportsDid not passDocument title
2023 AuditPDF · 25 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
2023-Approved-BudgetPDF · 5 pagesReportsDid not passDocument title
2024-Approved-BudgetPDF · 4 pagesReportsDid not passDocument title
Anderson-Cottonwood Irrigation District FS 12.31.24.pdf6c-2024-Audit · PDF · 25 pagesReportsDid not passTagged structure, Document language
Copy-of-2025-Approved-BudgetPDF · 4 pagesReportsDid not passDocument title
emergency action plan 2008PDF · 10 pagesReportsDid not passTagged structure, Document language, Document title, Image alt text
2022-Anderson-Cottonwood-ID-FSPDF · 22 pagesOtherDid not passTagged structure, Document language, Document title
Final Environmental/Assessment/Initial Study - ACIDacid final ea is clr4853 · PDF · 51 pagesOtherDid not passTagged structure, Document language, Image alt text
FINDING OF NO SIGNIFICANT IMPACTacid signed fonsi 110211 · PDF · 5 pagesOtherDid not passTagged structure, Document language, Image alt text
ACID-CBA-2022-2024PDF · 20 pagesOtherDid not passTagged structure, Document language, Document title, Image alt text
drainagePDF · 2 pagesOtherDid not passDocument title
drug- alcohol-free workplace testingPDF · 9 pagesOtherDid not passDocument language, Document title
injury illness prevention program 2008PDF · 25 pagesOtherDid not passTagged structure, Document language, Document title, Image alt text
Statement-of-Interest-FillablePDF · 1 pageOtherDid not passTagged structure, Document title, Form field labels
water deliveriesPDF · 1 pageOtherDid not passDocument title
Anderson-Cottonwood Irrigation District Customer Pipe Purchase ApplicationPipe-Application-Final · PDF · 2 pagesFormsPassedNone
RULES AND REGULATIONSACID-RULES-AND-REGULATIONS · PDF · 8 pagesPoliciesPassedNone
Anderson-Cottonwood Irrigation Districtbeneficial use · PDF · 1 pageOtherPassedNone
REFUND POLICYcomplaints to district · PDF · 1 pageOtherPassedNone
REFUND POLICYcost share work on district facilities · PDF · 1 pageOtherPassedNone
REFUND POLICYcost share work on non-district facilities · PDF · 1 pageOtherPassedNone
REFUND POLICYcost to provide new turnouts · PDF · 1 pageOtherPassedNone
REFUND POLICYcredit card · PDF · 1 pageOtherPassedNone
REFUND POLICYdesignated reserve accounts · PDF · 1 pageOtherPassedNone
REFUND POLICYexpenditure limitations · PDF · 1 pageOtherPassedNone
REFUND POLICYfacility improvements · PDF · 1 pageOtherPassedNone
ANDERSON-COTTONWOOD IRRIGATION DISTRICTharassment discrimination · PDF · 2 pagesOtherPassedNone
REFUND POLICYherbicide · PDF · 1 pageOtherPassedNone
REFUND POLICYleave · PDF · 1 pageOtherPassedNone
Anderson-Cottonwood Irrigation Districtpre-employment physical examinations · PDF · 1 pageOtherPassedNone
REFUND POLICYrefund · PDF · 1 pageOtherPassedNone
Anderson-Cottonwood Irrigation Districtreview of employee driving records · PDF · 1 pageOtherPassedNone
REFUND POLICYrisk transfer · PDF · 1 pageOtherPassedNone
Anderson-Cottonwood Irrigation Districtsafety - diversion dam · PDF · 1 pageOtherPassedNone
Anderson-Cottonwood Irrigation Districttobacco usage · PDF · 1 pageOtherPassedNone
Anderson-Cottonwood Irrigation Districtuse of equipment · PDF · 1 pageOtherPassedNone
Show all 49 files

1 more checked file is counted above but not linked here: it is on another site or its name looks like a personal record.

What each check looks for

Tagged structure
The file has a tag tree, so assistive technology can tell headings, lists and paragraphs apart.
Document language
The file declares its language, so screen readers pronounce it correctly.
Document title
The file has a document title, shown instead of the file name.
Image alt text
Every image in a tagged file carries alternative text, or the file has no untagged images.
Form field labels
Every fillable form field has a label a screen reader can announce.

How we measured this

  1. 1.Crawl

    We start at the organization's website and follow its sitemaps and links on the same site. We respect robots.txt and crawl delays, and skip login areas.

  2. 2.Classify

    Each document is sorted by file format and, from its link text and file name, into a category such as forms or agendas. Page counts are estimated, often without downloading the whole file.

  3. 3.Check a sample

    We open up to 50 PDFs and run basic machine checks: tags, document title, language, image alt text and form-field labels.

  4. 4.Publish only with evidence

    Figures appear only when a crawl finds at least 25 documents and checks at least 20 of them.

Limits of this method

  • We only see public pages we can reach through links or sitemaps. Documents behind logins or on other services may be missed.
  • Crawls stop at page, document and time limits. When one is hit, the counts are minimums.
  • Categories and page counts are estimates from links, file names and file metadata.
  • Machine checks can't judge reading order, alt text quality or table structure. Passing them is not WCAG 2.1 AA conformance.
  • Figures describe the site on the crawl date, not today.

This page's evidence

  • Crawled October 11, 2026: we fetched 4 pages from https://www.andersoncottonwoodirrigationdistrict.org/ and found 217 documents.
  • The pass rate comes from machine checks on 50 of those documents, not from checking every file.
  • Changelog: October 11, 2026 — inventory refreshed from the latest crawl.
  • How we crawl, classify and check documents

Plan the work before April 26, 2028

562 days is enough time to work through a backlog in stages, if the inventory starts now.

Where Anderson Cottonwood Irrigation District should start

Start with rate schedules, service applications and water quality reports: the documents customers rely on.

Customers need these files to start service, understand rates and read water quality results.

Usually owned by the general manager, customer service and the board secretary.

A timeline to April 26, 2028

  1. Inventory and triage

    by January 4, 2027

  2. Fix the documents people use most

    by September 14, 2027

  3. Everything in use conforms

    by April 26, 2028

A planning split of the time left, not a legal requirement.

Estimated cost with DocoMatic

$3,611 – $5,417

≈ 18,057 credits for 9,365 estimated pages

  • 173 form pages at Level 3 (field labeling and tab order)
  • 735 scanned pages (OCR plus Level 2 tagging)
  • 8,457 standard pages at Level 1

This is a directional estimate from crawler statistics, not a quote. Run the remediation cost calculator with your own page counts for a tailored figure.

What DocoMatic does

  • Finds the PDF, Word, PowerPoint and Excel files on your website and estimates the backlog.
  • Fixes documents at three levels, from basic tagging to complex forms.
  • Checks every fixed file, with veraPDF PDF/UA-1 validation from Level 2 up.
  • Human review: turn it on when you request a fix, or arrange it with our team.
  • Monitors your site so new documents don't rebuild the backlog.

Is this your organization?

If you work at Anderson Cottonwood Irrigation District, claim this page at no cost with an email address on andersoncottonwoodirrigationdistrict.org. You can check the figures, choose which ones are public and see the file-level inventory in the app.

Claiming isn't an admission of anything. It gives your team control of what this page shows.

Claim this page

Something wrong or out of date?

Tell us what to fix. Our team reviews every request and replies by email.

Request a correction or takedown

If you represent Anderson Cottonwood Irrigation District and something on this page is wrong, tell us. Requests are recorded, reviewed by DocoMatic staff and answered by email. If a takedown request is accepted, this page stops publishing statistics about Anderson Cottonwood Irrigation District.

What are you asking for?

At least 20 characters. Name the figures you dispute if you can.

Compare with similar organizations

Anderson Cottonwood Irrigation District beside the special districts in California closest to it in population that also have published reports.

OrganizationPopulationDocuments foundEstimated pagesCrawled
Anderson Cottonwood Irrigation District (this page)—2179,365October 11, 2026
Alameda Corridor Transportation Authority—1,49220,624October 7, 2026
Alameda County Housing Authority—44712,685October 7, 2026
Alameda County Mosquito Abatement District—269+7,488October 7, 2026
Alameda County Resource Conservation District—951,324October 7, 2026
Alameda County Transportation Commission—2,82552,918October 7, 2026

Each figure comes from that organization’s own crawl; a + marks a crawl that stopped at a limit, so its count is a minimum. The table compares document inventories, not accessibility.

Related organizations

Special districts in California

Also due April 26, 2028 in California

Frequently asked questions

When is Anderson Cottonwood Irrigation District's ADA Title II deadline?

April 26, 2028. Anderson Cottonwood Irrigation District is in the 2028 cohort under the Department of Justice's rule on web and mobile accessibility for state and local governments, with compliance dates as set by the Department's interim final rule of April 20, 2026 (91 FR 20902).

How was Anderson Cottonwood Irrigation District's deadline set?

Anderson Cottonwood Irrigation District is a special district government, and the Census Bureau calculates no population for one. The rule gives every special district government the later date, whatever the size of the area it serves.

How many public documents does Anderson Cottonwood Irrigation District have?

Our crawl on October 11, 2026 fetched 4 pages from https://www.andersoncottonwoodirrigationdistrict.org/ and found 217 documents, an estimated 9,365 pages. The full file-level list is available to verified staff after claiming the page.

How many of Anderson Cottonwood Irrigation District's documents pass accessibility checks?

22 of the 50 files we checked passed basic machine checks (44%). That is a sample of the 217 documents we found, and passing basic checks is not full WCAG 2.1 AA conformance.

How much would it cost to fix Anderson Cottonwood Irrigation District's documents?

Our directional estimate is $3,611 to $5,417 with DocoMatic: about 18,057 credits for 9,365 estimated pages, based on this crawl. It is not a quote.

Which documents should Anderson Cottonwood Irrigation District fix first?

Start with rate schedules, service applications and water quality reports: the documents customers rely on.

Do older PDFs have to be made accessible too?

Not all of them. Documents already posted before the compliance date are excepted unless they are currently used to apply for, gain access to, or participate in the organization's services, programs or activities (28 CFR 35.201(b)). Genuinely archived content is excepted too, but only while it is kept solely for reference, research or recordkeeping, sits in a clearly identified archive area and is not changed. Everything published from the compliance date on is covered, and so is any older file people still use to reach a service.