- special district
- California · Sonoma County
- 2028 cohort · 562 days left
Cloverdale Fire Protection District: ADA Title II document accessibility deadline and status
Our October 12, 2026 crawl of cloverdalefire.specialdistrict.org(opens in new tab) found 139 public documents, about 415 pages. 38 of the 50 files we checked passed basic machine checks.
Claim the page at no cost to see every document we found and each file's results. Work at Cloverdale Fire Protection District? Claim or correct this page.
- documents found
- 139
- estimated pages
- 415
- checked files passed
- 38 / 50
- crawl date
- Oct 12, 2026
What our crawl found on cloverdalefire.specialdistrict.org
Counts from our October 12, 2026 crawl, which visited 305 pages. Our crawler found 139 public documents on cloverdalefire.specialdistrict.org — an estimated 415 pages your team would otherwise inventory by hand.
Documents by category
- Agendas & minutes119 · 86%
- Other15 · 11%
- Reports3 · 2%
- Forms2 · 1%
Meeting agendas and minutes dominate this inventory at 86% of all documents. Packets published from the compliance date on have to be accessible, as do older ones residents still use to take part in a meeting or a process; older packets kept only for reference may fall under the rule's exceptions.
By file format
- PDF 138 · 99%
- Word (DOCX) 1 · <1%
Checked sample
38 of 50 passed(76%)
- Passed basic checks: 38
- Did not pass: 12
Many of the checked files pass the basic checks. Passing them is not full conformance: reading order, alt text quality and table structure still need a person or a deeper check.
The rate covers the 50 files we checked, not all 139 documents. Checks cover tag structure, document language, title, image alt text and form-field labels.
Scanned share
12% scanned
Most of the collection is digital-native text, which keeps remediation at the lighter end: tagging and structure work rather than OCR.
Scanned images need text recognition (OCR) before they can be tagged.
Forms are a small part of this inventory (1%), but each one needs labeled fields and a working tab order before someone using a screen reader can fill it in.
Crawl scope
- Crawl date
- October 12, 2026
- Pages visited
- 305
- Documents in the inventory
- 139
- Files checked
- 50
- Limits hit
- None reported
These are machine checks on a sample, not a compliance finding, and they say nothing about the people who publish Cloverdale Fire Protection District's documents. The results for the sampled files are public above. The full inventory of every document we found, with detailed per-file reports, is available to verified staff of Cloverdale Fire Protection District after claiming this page.
Files we checked on cloverdalefire.specialdistrict.org
Links go to the files on cloverdalefire.specialdistrict.org as we found them on October 12, 2026.
These are automated checks on a sample of files as published on October 12, 2026. They are not a legal compliance finding and don't cover reading order, alt-text quality or table structure. Something wrong? Ask for a correction or removal.
| File | Category | Result | Checks not passed |
|---|---|---|---|
| minutes 1-12-26 regularPDF · 3 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| minutes 9-17-25 regularPDF · 3 pages | Agendas & minutes | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 06-30-20 final reportPDF · 33 pages | Reports | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| 2024-2025 final budget WEBPDF · 6 pages | Reports | Did not pass | Document title |
| 2025-2026 final budget WEBPDF · 6 pages | Reports | Did not pass | Document title |
| 23-24 final appPDF · 1 page | Other | Did not pass | Document title |
| 23-24 final opPDF · 6 pages | Other | Did not pass | Document title |
| 6-30-2021 & 2020 Final Cloverdale FirePDF · 33 pages | Other | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Cloverdale Fire PD Final 2022PDF · 34 pages | Other | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Cloverdale Fire PD Final 2024PDF · 34 pages | Other | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Cloverdale Fire PD Final 6-30-23PDF · 34 pages | Other | Did not pass | Tagged structure, Document language, Document title, Image alt text |
| Notrice for in person 4-10-23PDF · 1 page | Other | Did not pass | Document title |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 1-12-26 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 10-13-25 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 11-10-25 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 11-14-22 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 2-9-26 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 3-2-26 special · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 4-8-24 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 6-2-26 special prop purchase agree · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 6-8-26 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTAgenda 8-10-26 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTAgenda 9-14-26 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 9-17-25 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda 9-26-22 regular · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda jpa ad hoc 10-13-25 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda jpa ad hoc 8-21-25 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTagenda-05-09-22 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTJPA Oversight Committee 2-4-26 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTjpa oversight committee 9-24-25 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTJPA Oversight Committee Agenda 7-13-26 · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 10-14-24 regular · PDF · 2 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 11-18-24 regular · PDF · 3 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 12-18-24 special measure h agreement · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 4-14-25 regular · PDF · 3 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 5-13-25 regular · PDF · 3 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 6-2-26 SPECIAL property resolution · PDF · 1 page | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 6-23-25 regular · PDF · 3 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 6-8-26 regular · PDF · 4 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 7-16-25 regular · PDF · 3 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 8-11-25 regular · PDF · 2 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 8-8-22 regular · PDF · 3 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 9-26-22 regular · PDF · 2 pages | Agendas & minutes | Passed | None |
| CLOVERDALE FIRE PROTECTION DISTRICTminutes 9-9-24 · PDF · 3 pages | Agendas & minutes | Passed | None |
| NOTICENOTICE 10-12-26 reschedule · PDF · 1 page | Agendas & minutes | Passed | None |
| NOTICENOTICE 12-9-24 cancel · PDF · 1 page | Agendas & minutes | Passed | None |
| NOTICENOTICE 7-13-26 cancellation · PDF · 1 page | Agendas & minutes | Passed | None |
| NOTICENOTICE 7-14-25 reschedule · PDF · 1 page | Agendas & minutes | Passed | None |
| NOTICENOTICE 7-8-24 cancelation · PDF · 1 page | Agendas & minutes | Passed | None |
| NOTICENOTICE 9-8-25 rescheduled · PDF · 1 page | Agendas & minutes | Passed | None |
Show all 50 filesShow fewer
What each check looks for
- Tagged structure
- The file has a tag tree, so assistive technology can tell headings, lists and paragraphs apart.
- Document language
- The file declares its language, so screen readers pronounce it correctly.
- Document title
- The file has a document title, shown instead of the file name.
- Image alt text
- Every image in a tagged file carries alternative text, or the file has no untagged images.
- Form field labels
- Every fillable form field has a label a screen reader can announce.
How we measured this
1.Crawl
We start at the organization's website and follow its sitemaps and links on the same site. We respect robots.txt and crawl delays, and skip login areas.
2.Classify
Each document is sorted by file format and, from its link text and file name, into a category such as forms or agendas. Page counts are estimated, often without downloading the whole file.
3.Check a sample
We open up to 50 PDFs and run basic machine checks: tags, document title, language, image alt text and form-field labels.
4.Publish only with evidence
Figures appear only when a crawl finds at least 25 documents and checks at least 20 of them.
Limits of this method
- We only see public pages we can reach through links or sitemaps. Documents behind logins or on other services may be missed.
- Crawls stop at page, document and time limits. When one is hit, the counts are minimums.
- Categories and page counts are estimates from links, file names and file metadata.
- Machine checks can't judge reading order, alt text quality or table structure. Passing them is not WCAG 2.1 AA conformance.
- Figures describe the site on the crawl date, not today.
This page's evidence
- Crawled October 12, 2026: we fetched 305 pages from https://cloverdalefire.specialdistrict.org/ and found 139 documents.
- The pass rate comes from machine checks on 50 of those documents, not from checking every file.
- Changelog: October 12, 2026 — inventory refreshed from the latest crawl.
- How we crawl, classify and check documents
Plan the work before April 26, 2028
562 days is enough time to work through a backlog in stages, if the inventory starts now.
Where Cloverdale Fire Protection District should start
Start with permit and inspection forms and public safety guides.
Residents and businesses need these files for permits, inspections and safety information.
Usually owned by the fire chief's office, the fire marshal and the board secretary.
A timeline to April 26, 2028
Inventory and triage
by January 4, 2027
Fix the documents people use most
by September 14, 2027
Everything in use conforms
by April 26, 2028
A planning split of the time left, not a legal requirement.
Estimated cost with DocoMatic
$167 – $250
≈ 834 credits for 415 estimated pages
- 6 form pages at Level 3 (field labeling and tab order)
- 49 scanned pages (OCR plus Level 2 tagging)
- 360 standard pages at Level 1
This is a directional estimate from crawler statistics, not a quote. Run the remediation cost calculator with your own page counts for a tailored figure.
What DocoMatic does
- Finds the PDF, Word, PowerPoint and Excel files on your website and estimates the backlog.
- Fixes documents at three levels, from basic tagging to complex forms.
- Checks every fixed file, with veraPDF PDF/UA-1 validation from Level 2 up.
- Human review: turn it on when you request a fix, or arrange it with our team.
- Monitors your site so new documents don't rebuild the backlog.
Buying for a larger organization? Book a 20-minute demo(opens in new tab)
Is this your organization?
If you work at Cloverdale Fire Protection District, claim this page at no cost with an email address on cloverdalefire.specialdistrict.org. You can check the figures, choose which ones are public and see the file-level inventory in the app.
Claiming isn't an admission of anything. It gives your team control of what this page shows.
Claim this pageSomething wrong or out of date?
Tell us what to fix. Our team reviews every request and replies by email.
Request a correction or takedown
If you represent Cloverdale Fire Protection District and something on this page is wrong, tell us. Requests are recorded, reviewed by DocoMatic staff and answered by email. If a takedown request is accepted, this page stops publishing statistics about Cloverdale Fire Protection District.
Compare with similar organizations
Cloverdale Fire Protection District beside the special districts in California closest to it in population that also have published reports.
| Organization | Population | Documents found | Estimated pages | Crawled |
|---|---|---|---|---|
| Cloverdale Fire Protection District (this page) | — | 139 | 415 | October 12, 2026 |
| Alameda Corridor Transportation Authority | — | 1,492 | 20,624 | October 7, 2026 |
| Alameda County Housing Authority | — | 447 | 12,685 | October 7, 2026 |
| Alameda County Mosquito Abatement District | — | 269+ | 7,488 | October 7, 2026 |
| Alameda County Resource Conservation District | — | 95 | 1,324 | October 7, 2026 |
| Alameda County Transportation Commission | — | 2,825 | 52,918 | October 7, 2026 |
Each figure comes from that organization’s own crawl; a + marks a crawl that stopped at a limit, so its count is a minimum. The table compares document inventories, not accessibility.
Related organizations
Special districts in California
- Alameda Corridor Transportation Authority: ADA deadline report
1,492 documents · due April 26, 2028
- Alameda County Housing Authority: ADA deadline report
447 documents · due April 26, 2028
- Alameda County Mosquito Abatement District: ADA deadline report
269 documents · due April 26, 2028
- Alameda County Resource Conservation District: ADA deadline report
95 documents · due April 26, 2028
Also due April 26, 2028 in California
- Ravendale-Termo Elementary School District: ADA deadline report
school district · 89 documents · due April 26, 2028
- Green Point Elementary School District: ADA deadline report
school district · 42 documents · due April 26, 2028
- Silver Fork Elementary School District: ADA deadline report
school district · 75 documents · due April 26, 2028
- City of Industry: ADA deadline report
city · 335 documents · due April 26, 2028
Frequently asked questions
When is Cloverdale Fire Protection District's ADA Title II deadline?
April 26, 2028. Cloverdale Fire Protection District is in the 2028 cohort under the Department of Justice's rule on web and mobile accessibility for state and local governments, with compliance dates as set by the Department's interim final rule of April 20, 2026 (91 FR 20902).
How was Cloverdale Fire Protection District's deadline set?
Cloverdale Fire Protection District is a special district government, and the Census Bureau calculates no population for one. The rule gives every special district government the later date, whatever the size of the area it serves.
How many public documents does Cloverdale Fire Protection District have?
Our crawl on October 12, 2026 fetched 305 pages from https://cloverdalefire.specialdistrict.org/ and found 139 documents, an estimated 415 pages. The full file-level list is available to verified staff after claiming the page.
How many of Cloverdale Fire Protection District's documents pass accessibility checks?
38 of the 50 files we checked passed basic machine checks (76%). That is a sample of the 139 documents we found, and passing basic checks is not full WCAG 2.1 AA conformance.
How much would it cost to fix Cloverdale Fire Protection District's documents?
Our directional estimate is $167 to $250 with DocoMatic: about 834 credits for 415 estimated pages, based on this crawl. It is not a quote.
Which documents should Cloverdale Fire Protection District fix first?
Start with permit and inspection forms and public safety guides.
Do older PDFs have to be made accessible too?
Not all of them. Documents already posted before the compliance date are excepted unless they are currently used to apply for, gain access to, or participate in the organization's services, programs or activities (28 CFR 35.201(b)). Genuinely archived content is excepted too, but only while it is kept solely for reference, research or recordkeeping, sits in a clearly identified archive area and is not changed. Everything published from the compliance date on is covered, and so is any older file people still use to reach a service.